EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
RANS21RB
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (676)
Research
Workshop
- (4)
Empennage
- (37)
Fuselage
- (155)
Firewall
- (19)
Tail Feathers
- (4)
Wings
- (99)
Controls
- (20)
Avionics
- (52)
Lighting
- (9)
Instrument Panel
- (8)
Landing Gear
- (6)
Engine
- (82)
Propeller
Fuel System
- (6)
Interior Finish
- (28)
-
Wiring and paint prep
-
Wing wires and...
-
Seats
-
Center console,...
-
Center Console
-
Paint
-
Side panels
-
Interior Trim panels
-
Wiring
-
Finish work
-
Wiring and trim panels
-
Brake Lines
-
Interior panels and...
-
Floorboard carpet...
-
Prep
-
Center Console
-
Rear Rudder Return...
-
Fresh Air Vents
-
Completed Interior...
-
Flap Handle Closeout
-
Cockpit trim panels
-
Cockpit
-
Cockpit interior
-
Interior Closeout...
-
Interior closeout...
-
Control Stick and...
-
Interior Closeout...
-
Closeout panels
Paint / Decals
- (90)
Inspection
- (3)
Tools
Inventory
- (3)
Kit Delivery
- (1)
Reassembly
- (50)
Builder Name:
Randall Brooks
-
Project:
Rans - S-21 Outbound
-
VIEW REPORTS
Total Hours:
1988
Total Flight Time:
Start/Last Date:
Apr 03, 2021 - No Finish Date
Engine:
Titan IO-340 180HP
Propeller:
Whirlwind
Friendly URL:
https://eaabuilderslog.org?s=RANS21RB
Home or Last Project Picture
Apr 23, 2022
Cockpit trim panels
- (2 hours)
Category: Interior Finish
Fit and match drilled forward baggage area floor, side panels and Station 2B closeout panel.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.